Shipped worldwide from our UAE factory · 3-week build

Glass pods

Glass office pods in Japan.

Tempered acoustic glass pods: the openness of glass, the privacy of −35 dB. Delivered to Japan factory-direct.

  • Built in 3 weeks
  • −35 dB speech privacy
  • 5-year warranty

In brief

Factory-direct, not freight-forwarded.

The appeal of a glass office pods is obvious — daylight, sightlines, an office that still looks like one team. The catch is acoustics: ordinary glazing leaks speech. Ikabin pods square it with tempered acoustic glass engineered as part of the sound envelope: full-height glazed fronts with −35 dB speech-level reduction, so the pod reads open and sounds sealed to Japan.

All three sizes carry the glazed front — SoloKabin™ booth, DuoKabin™ meeting pod, TeamKabin™ meeting room — with insulated steel-alloy panels, silent ventilation and LED lighting completing the room. Built in 3 weeks in Dubai, from AED 15,000 (≈ $4,084) factory-direct, 5-year warranty.

Glass pods

Open to the eye, sealed to the ear.

Frosting optional

Privacy film or frosting applies cleanly where more visual discretion is wanted.

Tempered safety glass

Workplace-specified tempered glazing, backed by the 5-year manufacturer warranty.

Acoustic glazing, full height

Tempered acoustic glass engineered into the sound envelope — not a window cut into a box.

Daylight reaches in

Glazed fronts keep pods bright and keep the office's daylight flowing past them.

The range

Three pods, one acoustic standard.

Ikabin pod specifications and factory-direct prices
PodCapacityExternal sizeAcousticsPrice
SoloKabin™Phone booth · 1–2 people1250 × 1250 × 2300 mm−35 dB speech privacyAED 15,000 ≈ $4,084
DuoKabin™Meeting pod · up to 42200 × 1250 × 2300 mm−35 dB speech privacyAED 20,000 ≈ $5,446
TeamKabin™Meeting room · up to 82500 × 2000 × 2250 mm−35 dB speech privacyAED 27,000 ≈ $7,352

Delivery

From our factory floor to yours, in four steps.

Door-to-door delivery anywhere in Japan — including Marunouchi, Shibuya, Shinjuku, Yokohama and Kawasaki — with full export documentation from our Dubai factory.

Request your quote

Tell us the pods and your delivery address — we reply with a full quote, shipping included, within one business day.

Built to order — 3 weeks

Your pods are built, finished in your RAL colour, quality-checked and packed container-ready in our Dubai factory.

Jebel Ali, Dubai → Tokyo / Yokohama / Osaka

Transit ≈4–6 weeks door-to-door. We prepare the full export documentation; your customs broker clears arrival.

Delivered and connected

Positioned on your floor and connected to local power by your electrician — then it's ready to use.

FAQ

Glass office pods in Japan — questions, answered.

The glazed front is standard, not an upgrade: SoloKabin™ AED 15,000 (≈ $4,084), DuoKabin™ AED 20,000 (≈ $5,446), TeamKabin™ AED 27,000 (≈ $7,352), factory-direct with export shipping quoted per address.

Yes — it is tempered safety glass, specified for workplace use, set in a steel-alloy frame. It is the same glazing standard across all three pod sizes.

Ordinary glazing would. Ikabin pods use tempered acoustic glass engineered as part of the acoustic envelope, with compression seals where glass meets frame — the full pod, glazed front included, delivers −35 dB speech-level reduction.

Yes. Pods ship with standard internal wiring for lighting, ventilation and outlets, terminating at a single connection point. Your electrician connects the pod to the building supply on site — typically under an hour per pod.

Yes — single-unit export orders are welcome. Many clients pilot one pod and then scale to multi-pod or container orders; per-unit pricing improves with volume, but there is no minimum.

The manufacturer

The factory behind the pods.

Ikabin designs and manufactures every pod in its own Dubai factory — UAE glass, steel-alloy and aluminium, one brand, three products. See how we manufacture →

470+projects completed
−35 dBspeech privacy, every pod
3 wksfactory build time
5 yrsmanufacturer warranty

Quiet, delivered to Japan.

Soundproof pods built in our UAE factory in 3 weeks, shipped door-to-door to Japan.